Skip to content
Fort Lauderdale, FL · Licensed in the state of FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — Palm BeachCall

Palm Beach cities · West Palm Beach

In West Palm Beach the Material Is Settled Before the Pressure Is

The city's preservation guidance says generally vinyl is not permitted in windows. On a designated property that decides the product before any calculation does.

Give us the address. In this county the address decides the pressure, the review, and often the price — before the window does.

Not HVHZ

Palm Beach uses statewide approval, not a Miami-Dade NOA

Still required

The county sits in the wind-borne debris region

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

A product category eliminated before the quote is written

West Palm Beach runs the heaviest preservation regime of the six places on this site, and its own guidance for making changes to your property contains a sentence most window quotes never mention. It is short: "Generally vinyl is not permitted for use in windows or fences." On a designated property that removes a whole product category from the conversation, and it removes it before anyone has calculated a pressure or looked up an approval number.

The same page says what the city would rather see. "If said windows are beyond repair, staff recommends replacement in-kind with aluminum impact products." It goes further on configuration: "For most pre-war houses, horizontal slider windows are not visually compatible. Depending on the architectural style, single or double-hung sash windows or casements are a better fit." For a midcentury house it asks the replacement to "replicate the look of jalousie or awning windows with single-hung, single-pane casement, or horizontal sliders." These are not private preferences held by one reviewer. They are published, and they are what staff reads an application against.

The line that catches people out is the one about extent. "For both contributing and noncontributing properties, all sides of the building are reviewed." A homeowner planning to put the good units on the street elevation and something cheaper across the back is planning against a rule the city has already written down, and a noncontributing house inside a district does not escape it.

What the city's preservation guidance constrains

  • Material: generally vinyl is not permitted for use in windows or fences.
  • Direction of travel: staff recommends replacement in-kind with aluminum impact products where the existing windows are beyond repair.
  • Configuration by era. Pre-war houses are steered away from horizontal sliders; midcentury properties are asked to replicate the look of jalousie or awning openings.
  • Extent: all sides of the building are reviewed, on contributing and noncontributing properties alike.
  • Route: a minor Certificate of Appropriateness can be approved administratively by staff, while a major one goes to the Historic Preservation Board.
  • Performance, in the Building Division's own words: the selected products must meet the wind loads experienced in West Palm Beach and be installed in accordance with manufacturer product approval documents.

What the city names, and who has to approve it

The guidance also does not soften for a rental or for a small association. Review covers all sides of the building whether or not the owner lives behind the glass, so a landlord and a resident are specifying to the same standard. What differs is who has to approve the spend and how long that takes, and that belongs in the schedule rather than in a surprise phone call the week the units land.

The city also names the rules rather than leaving you to guess at them. Exterior modifications to a historic structure are required to comply with the Historic Preservation Ordinance and the city's own Design Guidelines, and the section cited in the Zoning and Land Development Regulations is 94-49. You can read all of that before buying anything, which is the point. A rejected specification is not a return on a made-to-order unit, it is a re-order and a new lead time, and that is the argument for spending the first afternoon at the planning counter rather than in a showroom.

How we run a job here

  1. 01Check the address against the preservation program before pricing anything. The program currently counts 18 locally designated historic districts and 46 individually designated sites.
  2. 02Price the aluminum route first on a designated property rather than quoting vinyl and meeting the guidance afterwards.
  3. 03Specify one standard across every elevation, since the rear of the house is reviewed alongside the front.
  4. 04Establish whether the scope is a minor or a major Certificate of Appropriateness, because that decides whether staff can sign it or the board has to convene.
  5. 05Keep the Building Department registration current, which is a separate step from holding a portal account.
  6. 06Run the address through the city's planning and permitting research tool early, so zoning and preservation questions arrive together rather than one at a time.

We start on the planning side rather than the product side in this city, which is the reverse of how a window job normally runs. Once the material and the configuration are settled, the engineering question is ordinary and can be priced quickly. Doing it the other way round means pricing a unit the city has already said in writing it does not want, and then having that conversation with a deposit paid and a lead time running.

Source: City of West Palm Beach historic preservation guidance, How to Make Changes to My Property, plus the Building Division and Historic Preservation Program pages — checked 2026-09-24

Said plainly

Where we stop

Contractors register with the Building Department separately from creating a portal profile, by sending the city a state or county license, a certificate of liability insurance, proof of workers compensation and a valid local business tax receipt. Keeping that current is ours. The hearing is not. On a major Certificate of Appropriateness for a designated property, an architect who appears in front of that board regularly is a better advocate than a window contractor, and we would rather say so than stand in for one and lose you a month.

FAQ

Common questions

Can I put vinyl impact windows in a designated house here?
The city's guidance says generally vinyl is not permitted for use in windows or fences, and that staff recommends aluminum impact products instead. Confirm whether your address is designated before you price a vinyl unit.
Does the review only look at the front of the house?
No. The guidance is explicit that for both contributing and noncontributing properties, all sides of the building are reviewed. Budget the same product standard on the rear elevation as on the street.
How many historic districts does the city have?
The preservation program currently counts 18 locally designated districts and 46 individually designated sites. What matters for your job is only whether your address falls inside one, which the Planning Division can confirm.
Do I need a permit to swap two windows?
Yes. The Building Division FAQ answers that directly: a permit is required for replacing windows and doors. It also requires products to meet the wind loads experienced in the city and to be installed per the approval documents.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.