Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — Palm BeachCall

Palm Beach specifics · The Western Communities

Wellington and the West — Lower Pressures, Larger Houses, More Openings

Move inland from the coast and the calculated pressures fall while the houses get larger. That combination changes the economics of a job here more than anything else in the county.

Give us the address. In this county the address decides the pressure, the review, and often the price — before the window does.

Not HVHZ

Palm Beach uses statewide approval, not a Miami-Dade NOA

Still required

The county sits in the wind-borne debris region

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

Coastal figures applied to an inland address

Design wind pressure falls with distance from the coast. A house in Loxahatchee is not carrying the same figure as a house on the barrier island, and applying an island specification to a western address is the inland version of the same mistake as importing Broward specification into Boca Raton. It over-specifies the product, it inflates the quote, and it is done because one figure was applied across the county rather than calculated for the address.

What is different about a western job

  • Lower calculated pressures than the coastal strip.
  • Larger houses with substantially more openings per job.
  • Extensive rear glazing onto pool decks and screened enclosures.
  • Long sliders and grouped French pairs as standard rather than as features.
  • Single-story sprawl rather than height, which keeps figures down.

What exposure means, and why it is not just distance

The calculation takes account of exposure category — broadly, what the wind travels over before it reaches the building. Open farmland and pasture, which much of the western county was until recently, offers less resistance than dense suburban development. Distance from the coast is the biggest factor but it is not the only one.

This is why two houses the same distance inland can carry different figures, and why we would rather calculate per opening than apply a rule of thumb. On an estate house with thirty-plus openings across four elevations, that difference is not academic — it is the difference between a fair quote and a padded one.

How we handle it

  1. 01Calculate for the actual address rather than for the county.
  2. 02Survey every opening on a house that may have thirty of them.
  3. 03Sequence a large job so the house is not open all at once.
  4. 04Coordinate around screened enclosures and pool cages where they obstruct access.

These are the jobs where the count matters more than the individual unit. A western estate house can carry three or four times the openings of a coastal condominium, so a small per-unit saving from correct specification compounds into a serious number. It is also why we sequence these jobs by elevation rather than working across the house at random — nobody wants the whole rear of the house open on the same afternoon.

Said plainly

Where we stop

Lower pressure is not no pressure, and the debris requirement applies out west exactly as it does on the coast. This is an argument for calculating properly, not for specifying lightly, and on a two-story western house with an exposed elevation the figures can still be substantial.

FAQ

Common questions

Do I need impact windows out in Wellington?
The wind-borne debris requirement covers the county, so opening protection applies inland as well as on the coast. What changes is the calculated pressure, which is generally lower, and therefore how wide the field of suitable products is.
Will a big house cost proportionally more?
Roughly, yes, because cost tracks the number and size of openings more than anything else. Where scale helps is in the fixed parts of the job — one mobilization, one permit process, one crew learning one house.
How do you handle a screened pool enclosure in the way?
It is an access question we settle at the survey rather than on the first morning. Sometimes panels come out and go back, sometimes the sequence changes to work around it. Either way it belongs in the plan, not in a surprise conversation on site.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.