Skip to content
Fort Lauderdale, FL · Licensed in the state of FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — Palm BeachCall

Palm Beach cities · Boca Raton

Over the Counter in Boca Raton, and the Checking Moves to Your Driveway

Boca Raton issues window and door permits over the counter for single-family homes. Nothing is checked in advance, so everything is checked on site.

Give us the address. In this county the address decides the pressure, the review, and often the price — before the window does.

Not HVHZ

Palm Beach uses statewide approval, not a Miami-Dade NOA

Still required

The county sits in the wind-borne debris region

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

A permit that skips plan review does not skip the requirements

The city's own form for this work is headed Windows, Doors, or Impact Shutters — Single Family Residence, and it says plainly that "Plans examination under certain conditions is not required as stated in Section 107.1 Florida Building Code 8th Edition (2023) & Section 19-106 (2) of the Boca Raton Building Regulations." Homeowners read that as a formality and contractors sell it as speed. What it actually means is that nobody sits down with your product approvals before the work starts, so the first person to read them is the inspector standing in your driveway after the units are already in the wall.

The affidavit is explicit about what happens then. In the city's words: "Applicant understands that complete and legible Product Approval or Notice of Acceptance (NOA) of all products installed are to be on site for inspection purposes, failure to provide Product Approval or Notice of Acceptance (NOA) may result in a failed inspection with re-inspection fees assessed." A missing page is not a filing problem at that stage. It is a failed inspection on a finished wall, and the fee is the smaller half of the cost.

Then there is the second signature. Boca Raton requires a separately notarized HOA Regulations Notification Affidavit for permits on property governed by an association, and it states: "I understand that the issuance of a building permit by the City of Boca Raton does not exempt me from all other regulations imposed by my HOA." The city will not referee that argument. It has made you sign that you know the argument is available, and finding a notary becomes one more errand on a job that was described as over-the-counter.

What the Boca Raton affidavit puts on record

  • Complete, legible product approval for every installed product, physically on site at inspection.
  • The city's wording on doors: units not meeting exceptions 1 and 2 of FBC 1709.5.1 and FBC R609.3 are to be tested for water infiltration.
  • The applicant's attestation to the city memorandum dated January 1st, 2018, "that the wind velocity used for single family residence is 170 mph and that all buildings or structures shall be considered Exposure C unless Exposure D applies."
  • A notarized HOA Regulations Notification Affidavit where an association governs the property.
  • An association approval letter inside the permit package where the board asks for one.

A retrofit permit, and what it inherits

Look at what the city's form is actually for. It is limited to windows, doors or impact shutters of a single-family residence, which is to say a replacement, like for like, into an opening somebody else built. There is no version of this permit for a new wall. Almost every window job in this city is a retrofit, and the affidavit you put your name to is an affidavit about another contractor's work.

A retrofit inherits whatever the last contractor did. A buck that was never sealed properly, a sill with no drainage path, stucco returns cut to suit a frame profile nobody makes any more. None of that appears on a product approval, and on a permit issued over the counter none of it gets looked at until the inspection. That is why we survey the opening rather than the existing frame, and why we would rather find the surprise at the measure than at the final.

How we run a job here

  1. 01Read the address against the city's designated districts of Old Floresta and Pearl City before selecting a product, because a Certificate of Appropriateness runs on its own monthly calendar.
  2. 02Assemble the product approval set as a job document rather than as a filing copy, so the pages the inspector asks for are on site, complete and legible.
  3. 03Settle the door specification against the water infiltration language on the city's own form before anything is ordered.
  4. 04Get the association affidavit notarized and the board's approval letter in hand before the permit package goes in, not after.

The over-the-counter route is genuinely quicker and we use it. What we do not do is treat it as a lighter standard. Every opening on the schedule carries its approval number and every approval sits in the folder on site, because the whole design of this permit type is that verification happens once, at the end, in front of somebody with the authority to fail it. A crew that has never worked in this city tends to discover that on the wrong morning.

Source: City of Boca Raton Single Family Windows, Doors, Shutters Affidavit, HOA Regulations Notification Affidavit and Certificate of Appropriateness checklist — checked 2026-09-24

Said plainly

Where we stop

We do not sit on Historic Preservation Board agendas and we do not negotiate with an association for you. The board meets once a month, typically the third Tuesday, applications are due three weeks ahead of the meeting, and applicants are told to bring samples of proposed exterior materials with them. That is your property and your neighbors, and it goes better when the owner is in the room. Where a Certificate of Appropriateness applies in Old Floresta or Pearl City we will tell you early and supply the product data, and we will not present ourselves as your representative at the hearing.

FAQ

Common questions

If there is no plan review, is the permit just a formality?
No. It moves the checking to the final inspection. The city's affidavit warns that missing or illegible product approval may result in a failed inspection with re-inspection fees assessed. The scrutiny is later, not lighter.
Does my window have to be rated for 170 mph?
That is not what the figure means. The city's affidavit has the applicant attest to a 2018 memorandum giving 170 mph as the wind velocity used for single family residence. It is a calculation input, not a product label.
My board already approved the color. Do I still need the affidavit?
Yes, notarized, where an association governs the property. And if your board wants its approval letter inside the permit package, the city's affidavit says that letter must be submitted with the affidavit.
Is my street inside a historic district?
The city's designated districts are Old Floresta and Pearl City, plus individual historic sites anywhere in the city. Check the address against the city's map rather than assuming, because the review calendar sits in front of the order.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.